I am SO excited about the completion of this project! The closet in the hallway that holds all of our shoes, coats, purses, etc has long been a headache. Because of the sliding doors, you could never really see inside the whole thing at once. They doors were forever getting hung up on a runaway shoe or sweatshirt, it was just a mess. We started dreaming about building a better solution for this as soon as we moved in. We finally took the plunge! Here is a before shot: The plan is to remove the doors, cut the frame open up to the ceiling, and build lockers and cabinets that better suit our needs. We also cut about 16 inches into the wall on the right side, where the closet extended back.
It took about 2 months to find the right carpenter. The first four that bid the job out were WAY above our budget. Finally we found the perfect match, Uriah the handyman. Part carpenter, part handyman, he was the perfect guy for the job, and we could afford him. Hooray! We spent a day or two together getting the nitty gritty design down, and then he took away the plan and started returning with boxes:
Next was the first phase of install,
And then we got to this point, when I just about had a heart attack because it's when I have to paint the dang thing. I almost waffled, but then I got brave and started taping it off, and made a giant "bubble" in the house.
Then comes the fun part, spraying it. Three times a day, I suited up and shot the paint, until it all shined like the top of the Chrysler building. :)
Here it is after my paint job:
Then Uriah came back and did the final measurements on the doors, and when they arrived I turned the garage into this:
the kids could hardly wait to move in
And here is Uriah, our builder. He did a great job, and put up with lots of chit chat from Heidi along the way. We are just thrilled with how this project turned out!!!